
client
Client: Canberra Metro Construction (CMC)
project
The Auburn Junction Project Stage 11
- Signalling Design System Safety Assurance
DETAILS
The Canberra Light Rail Stage 2A project involves the extension of the city’s light rail network from Alinga Street to Commonwealth Park, spanning approximately 1.7 kilometers.
This stage includes the construction of three new stops, a dedicated light rail bridge across Parkes Way, and the integration of green and sustainable design elements to support Canberra’s environmental goals. With a project cost of approximately $400 million, Stage 2A represents a significant investment in the city’s public transport infrastructure. Riskon provided expert systems engineering and safety assurance services to ensure the project met critical safety, operational, and regulatory requirements, paving the way for a smooth transition to the next stages of the light rail network.
