top of page

DETAILS
The LTBP involved the design, construction and commissioning 1.8km of new track, two new mainline turnouts, new platform, concourse and footbridge extension, installation of a new lift, minor reconfiguration of the existing train stabling facilities and signalling reconfiguration at Liverpool Train Station in Sydney South West.

bottom of page